Cork Solar by Renewables Ireland

Solar panel installation in Cork

Our Cork office at Marina Commercial Park serves the city and the surrounding areas. Site surveys, installation and aftercare are carried out by the local team, and we manage the SEAI grant application on your behalf.

Solar panels installed on a period home in Cork
Brian Morgan, Head of Sales at Cork Solar
Your local contact in Cork

Brian Morgan

Head of Sales, Cork Solar

Brian runs the Cork operation from our office at Marina Commercial Park. He handles surveys and quotes across the city and the surrounding areas, so you are dealing with someone based here rather than a call centre in Dublin.

021 601 7154 office087 644 2347 mobile[email protected]Connect on LinkedInUnit P5, Marina Commercial Park, Centre Park Road, Ballintemple, Cork, T12 K12W

We have a team in Cork covering the city and the surrounding areas, so surveys and installations are managed locally rather than run from Dublin. We concentrate on the city and its immediate hinterland rather than the whole county, with the same SEAI paperwork handled for you and the same warranties as every other job we do.

Areas we cover around Cork

Also covering Cork City, Glanmire, Togher, Passage West, Blarney, Monkstown, Glounthaune, Mahon, Ballinlough, Grange, Tower, Cobh, Frankfield, Donnybrook, Ballyvolane, Mayfield, Curraheen, Ovens, Waterfall.

What we install

  • Solar Panels
  • Battery Storage
  • EV Chargers
  • Commercial Solar

Our Cork base

Unit P5, Marina Commercial Park, Centre Park Road, Ballintemple, Cork, T12 K12W

Local contact: Brian Morgan, Head of Sales

Recent work around Cork

Recent installations by the Cork team, across the city and the surrounding areas.

Solar PV

Solar PV

All-black panels sitting flush on a modern roof. Sized to the household and fitted in a day, with the SEAI grant handled for you.

Battery storage

Battery storage

A Sigenergy inverter and battery, so the midday surplus is stored and used in the evening rather than exported at a lower rate.

EV charging

EV charging

Home chargers installed alongside the panels, with the SEAI grant of up to €300 applied.

Getting solar installed in Cork

The SEAI grant

Up to €1,800 towards a domestic solar PV system of 4kWp or above, and up to €300 towards a home EV charger. We handle the paperwork and the grant is deducted from what you pay.

Planning permission

Since October 2021 rooftop solar is exempt from planning permission for most Irish homes. The exceptions are protected structures and a small number of zones near airports.

How long it takes

A survey first to confirm the roof and size the system properly, then a typical install of one to two days, with roof and electrical work running together.

More on grants, sizing and maintenance is on our frequently asked questions page, or see what a home solar system involves.

    Cork Solar | Solar Panel Installation in Cork | Renewables Ireland