Co. Cork

Solar Panel Installation in Bishopstown

Bishopstown is largely 1970s and 80s semi-detached housing with mature gardens, so tree shading is worth assessing properly. It changes panel layout and sometimes the inverter choice, and it is the sort of thing that only shows up on a site visit.

Areas we cover around Bishopstown

  • Wilton
  • Model Farm Road
  • Curraheen
  • Ballincollig
  • Togher

What we install

  • Solar Panels
  • Battery Storage
  • EV Chargers

Our Bishopstown base

Unit P5, Marina Commercial Park, Centre Park Road, Ballintemple, Cork, T12 K12W

Local contact: Brian Morgan, Head of Sales

Getting solar installed in Bishopstown

The SEAI grant

Up to €1,800 towards a domestic solar PV system of 4kWp or above, and up to €300 towards a home EV charger. We handle the paperwork and the grant is deducted from what you pay.

Planning permission

Since October 2021 rooftop solar is exempt from planning permission for most Irish homes. The exceptions are protected structures and a small number of zones near airports.

How long it takes

A survey first to confirm the roof and size the system properly, then a typical install of one to two days. Roof work and the electrical side usually run at the same time.

More detail on grants, sizing and maintenance is on our frequently asked questions page, or see what a home solar system involves.

    Solar Panel Installation in Bishopstown | Cork Solar | Renewables Ireland